MARINA RESERVOIR – Notification of projects in the reservoir

Title of Project                           : Proposed Temporary Cofferdam for Construction of Outdoor Theatre at Esplanade

 Contractor                                 : Quek & Quek Civil Engineering Pte Ltd

Contact                                     : 94553369 (Mr James Chia) or 92762808 (Andrew Tan)

 Project Duration in the water      :17 Dec 2007 – 31 May 2008

Location                                    : Marina Bay (As shown in attached drawing)


Table 1 shows the project schedule for the Proposed Temporary Cofferdam for Construction of Outdoor Theatre at Esplanade. The project area will occupy part of Marina Bay.

 

Table 1

Construction Project Schedule

 

 Starting Date

Work Activities

Time

17 Dec 07 – 24 Feb 08

Installation of temporary cofferdam

0800hr – 2400hr

25 Feb 08 – 30 Apr 08

Installation on bored piles and construction of RC structure

0800hr – 2400hr

5 May 08 – 31 May 08

Removal of temporary cofferdam

0800hr – 2400hr


The construction boundaries are marked by points A, B, C, D and E shown in the figure below. The coordinates and characteristics of buoys marking the points are shown in Table 2. All vessels are to keep clear of the construction boundary.

 

Silt CurtainEDCBA

 


Table 2

Coordinates of Work Boundary

Point

Geographical Coordinates

Buoys Characteristic

Light Characteristics

A

Latitude 1 ° 17’ 20.27” N

Longitude 103 ° 51’ 26.4” E

Colour: Orange

Colour: Orange

Flashing once every 3 sec

B

Latitude 1 ° 17’ 19.02” N

Longitude 103 ° 51’ 26.3” E

Colour: Orange

Colour: Orange

Flashing once every 3 sec

C

Latitude 1 ° 17’ 18.94” N

Longitude 103 ° 51’ 27.6” E

Colour: Orange

Colour: Orange

Flashing once every 3 sec

D

Latitude 1 ° 17’ 18.85” N

Longitude 103 ° 51’ 29.2” E

Colour: Orange

Colour: Orange

Flashing once every 3 sec

E

Latitude 1 ° 17’ 20.1” N

Longitude 103 ° 51’ 29.2” E

Colour: Orange

Colour: Orange

Flashing once every 3 sec